Overlay 60

 
. STAT

Tasks

  • Verify Loops
    • Verify all loops ENBL,
    • ENLL all DSBL loops
    • Troubleshoot any DSBL loops
    • If Telecom Analyst determines loop is no longer in production, schedule for de-configuration of all related programming.
  • Verify Channels
    • Verify all channels on all loops IDLE/BUSY
    • Troubleshoot/escalate any condition other than IDLE/BUSY
    . LCNT

    Tasks

    • Verify all counters clear
    • Note any counters that are not zero
    • Monitor for repeat issues with counters
    . SSCK [0/1]
    
    . SSCK [lll s]

    Tasks

    • Verify clock controller locked on primary reference
    • Troubleshoot/escalate any issues with the clock controller