Overlay 60
. STAT
Tasks
- Verify Loops
- Verify all loops ENBL,
- ENLL all DSBL loops
- Troubleshoot any DSBL loops
- If Telecom Analyst determines loop is no longer in production, schedule for de-configuration of all related programming.
- Verify Channels
- Verify all channels on all loops IDLE/BUSY
- Troubleshoot/escalate any condition other than IDLE/BUSY
. LCNT
Tasks
- Verify all counters clear
- Note any counters that are not zero
- Monitor for repeat issues with counters
. SSCK [0/1] . SSCK [lll s]
Tasks
- Verify clock controller locked on primary reference
- Troubleshoot/escalate any issues with the clock controller